Skip to content
Places

U.S. 14A over the Bighorns closes at noon Dec. 1 until Memorial Day

Last updated: November 27, 2026

U.S. 14A winds up the west slope of the Bighorn Mountains above a broad valley
Photo: Chris Light / Wikimedia Commons (CC BY-SA 4.0)

Drivers crossing the Bighorn Mountains on U.S. 14A have until noon on Tuesday, Dec. 1, before the Wyoming Department of Transportation closes the 22-mile mountain road in north-central Wyoming for the season.

No storm is forcing the shutdown. Every year, WYDOT closes the highway once the fall hunting season wraps up. "WYDOT closes U.S. 14A seasonally as a safety precaution rather than as a reaction to storms," the department said in its announcement of the closure.

Keeping it plowed all winter would mean fighting heavy snow and drifts on a road few people drive in those months. "Heavy snows, drifting, and relatively light traffic during the winter months make snow removal of the mountain portion of U.S. 14A impractical," the department said.

Until the road reopens, travelers headed between Sheridan and Lovell will have to take U.S. 14 over Granite Pass and through Greybull instead.

WYDOT wants drivers to look up conditions on that route before they leave, either by dialing 5-1-1 or through the WYO511 app.

On closing day, crews out of Lovell and Burgess Junction will make one last pass over the mountain to be sure nobody's still up there. Then they'll shut the gates at noon.

One gate is at Burgess Junction, at milepost 98.1. The other sits near milepost 76.04, east of Lovell.

Most years, WYDOT has U.S. 14A open again by Memorial Day weekend, or as soon as the weather allows.

You Might Also Like